Home
/
Sekondi To Takoradi Suburban Railway Line

Sekondi To Takoradi Suburban Railway Line

Railways & Roads Engineering

Project Details

Client Name:

Ghana Railway Development Authority

Project Location:

Sekondi to Takoradi, Ghana

Project Status:

Completed

Project Description

As part of the Government of Ghana’s efforts to revive the railway service in the country, supported by the results of professional studies, the reconstruction of the western railway line was selected as the beginning of this revival. Based on Amandi’s expertise and excellent previous performance, the company was awarded the contract to design and build the suburban railway service infrastructure from Takoradi to Sekondi via Kojokrom, in the Western Region of Ghana. This would be a first of its kind, with design parameters of 21 tons axle load and a speed of 120 km/h, on concrete sleepers.

Advanced signaling and communication systems, as well as level crossing controls were introduced to increase safety and reliability of the suburban services within the highly urbanized area. The project includes the construction and redevelopment of 30km of railway line, 9 railway stations and halts, and the supply of two Diesel Multiple Unit train sets.

Project Image Gallery

RELATED PROJECTS

Click On A Project To View Details

WordPress Depot IT Solutions & Technology Multi-Purpose Elementor WordPress Theme – Agiletech iTalk – Event & Conference Elementor Template Kit Itechie – IT Solutions and Services WordPress Theme IThemes BackupBuddy WordPress Plugin iThemes Content Upgrades iThemes Sales Accelerator Inventory iThemes Sales Accelerator MultiChannel iThemes Sales Accelerator Reporting Pro iThemes Security Pro ITok – ICO and Cryptocurrency WordPress Theme