Advanced signaling and communication systems, as well as level crossing controls were introduced to increase safety and reliability of the suburban services within the highly urbanized area. The project includes the construction and redevelopment of 30km of railway line, 9 railway stations and halts, and the supply of two Diesel Multiple Unit train sets.